Service

Production tracking and shop floor software

Who is on what, which stage each order has reached, and what it actually cost. An application built for the shop floor — for people whose hands are busy, not for people sitting at a desk.

Tablet at each stationRFID cardProduction stagesReal timesPhotos
What usually happens

The work order travels round the factory on paper. Times are written in pen and added up by hand when the job closes.

What I do

A tablet station at each stage: the operator identifies themselves, sees the task, and opens and closes the work as it happens.

What changes

You stop knowing only what was invoiced. You start knowing what it cost, by job, by stage and by operator.

Built for the shop floor, not the office

A production station is not a desk. Hands are dirty or gloved, the operator is standing, it is noisy, and nobody is going to type a twelve-character password eight times a day. A shop floor application that ignores this does not get used — it gets worked around, and within two weeks everything is back on paper.

So the screen has big buttons, few steps and no unnecessary typing. And authentication uses what the operator already carries.

Identification without friction

The card they already use. In most factories operators already clock in with an RFID card. That same card — or a keyfob, or any other tag — gets them into the station. No new card, no new habit, and compatible readers cost a few euros.

PIN as a fallback. For the day somebody forgets their card, a four-to-six digit code solves it. Small complexity, a lot of robustness.

The clocking system stays untouched. The attendance terminal already in place carries on doing its job. You don't break what works.

Stages, tasks and the real status of each job

Few production lines are a straight line. Stages run in parallel, there are sub-stages, and there are ad-hoc tasks the supervisor assigns on the spot. The system is designed around the factory's real sequence, not a textbook model — and from then on anyone can see, at any hour, where each order stands and who is working on it.

Times and real cost

Times are counted while the work is happening, by job, by stage and by operator. That is the difference between estimating and knowing. With that base, the figures that matter stop being guesswork: how long each stage actually takes, where jobs get stuck, what that order cost in labour, and whether the price you charge still makes sense.

One thing worth saying out loud: measuring times per operator touches employment law and personal data. How this is presented to the team makes all the difference between a tool that is accepted and a tool that is sabotaged. I raise it with whoever decides, before anything is built.

And when there is nothing to read from?

Not every machine gives you data. There are presses, ovens and lines that have been running for twenty years with no output at all. And there are stations where a tablet makes no sense, because there is nowhere to mount it and no free hands to touch it.

In those cases the physical side is mine too: a reader on the bench, a button panel you can use with gloves on, a counter wired to a machine that never counted anything for anyone. Built from industrial components that already exist, in an enclosure made for that spot, with the software written for that process.

A job like this usually involves three suppliers — the software one, the automation one and the ERP one. When something fails, each points at the others and the company is left in the middle. Here it is one person, from the sensor to the report.

Connected to the ERP, not replacing it

Invoicing, stock and purchasing stay where they are. The system reads what already exists — orders, items, customers — and returns what was produced in the format the ERP expects. Primavera, PHC, Cegid, eticadata: the operations layer is what's missing, not the ERP.

Frequently asked questions

Do we have to change the clocking terminal? No. It stays as it is. Only the same type of card is reused to log in at the stations.

What if the factory has poor network coverage? We check on site. Where coverage is good there is no need to over-engineer; where it isn't, we buffer at the critical points.

How many tablets do we need? It depends on the stages and how many run at once. Normally one per stage, not one per operator.

How long does it take? A system like this goes in by phases. The first — identification, tasks and times — is the shortest and is already the one that changes the day.

Do you know what the last order out of the factory cost?

If the answer takes a while, it's worth talking. The first conversation costs nothing.

or call 914 106 162

WhatsApp