Batch traceability software
Answer two questions in minutes rather than hours: where did this product come from, and where did this batch go. Starting from the batch system the team already knows and the equipment already on the floor.
The information exists — at goods-in, on production sheets, on labels, in the ERP, in a spreadsheet — but each station keeps its own piece. Rebuilding a batch means someone cross-checking paperwork for hours.
A continuous record along the process, with every pallet or case identified by a code that can be scanned at any station in the plant.
A traceability test, an audit or a recall stops being an investigation. Pick the batch and you see its origin, its route and its customers.
One step back, one step forward
European law requires every food business to know who supplied each product and who it was delivered to. Certification schemes such as IFS, BRCGS or ISO 22000 go further and ask for periodic, timed traceability tests. Most companies meet the requirement — but at the cost of paper, memory and a lost afternoon every time they have to prove it.
Where traceability usually gets lost
Rarely at goods-in, where almost everyone records what comes in properly. It gets lost at the hand-overs:
- When the pallet carries the day's batch rather than its actual origin — and several origins came in that day.
- When processing combines product from different batches or days, and the mix isn't recorded.
- When dispatch builds mixed loads and the link between pallet and customer lives on a paper delivery note.
- When things are recorded at the end, from memory, instead of at the moment they happen.
How I approach a traceability project
First, go to the plant. Walk through every station — goods-in, production, packing, cold stores, dispatch — and look at the forms, labels and files that already exist. That's where you see where the chain breaks.
Keep the batch system the team knows. Often the way the company numbers its batches is already fine; what fails is recording the move from one step to the next. You don't change what works.
Few new actions. Each person gains one or two actions — pressing a button when the load changes, scanning a code at the cold-store door — and what is handwritten today is printed by the system.
Use the equipment that's there. The station PCs, the label printers already installed, the scales. Equipment is only added where it is really missing, such as a rugged scanner for the cold. Connecting scales and printers is done case by case, and no phase depends on it.
In phases, each one useful on its own. Usually: link origin to finished product; then processing; then cold stores and dispatch. Each phase goes live before the next one starts.
What the system gives you
- Look-ups in both directions — from a pallet to its origin, and from an origin batch to every pallet and customer that came out of it.
- A barcode label on every pallet or case, readable at any station.
- The route of every pallet — where it was and when.
- Yield and mass balance — what came in against what went out, by day, by batch or by origin.
- Quality linked to the batch — quality control and supplier assessment forms open from the origin they refer to.
- Audit-ready reports, including for traceability tests.
Connected to what already exists
Traceability doesn't replace the ERP. It pulls items, customers and orders from it, and leaves invoicing and stock where they are. I build these links with Primavera, PHC, Cegid and eticadata, and with more specific production software too, always through the route the vendor allows.
Which companies it's for
Food and agri-food — meat and poultry, fruit and vegetables, dairy, bakery, drinks — and any company that works with batches or serial numbers and has to prove where what it sells came from. Mainly in the Oeste region, Leiria and Greater Lisbon, where I can be at the plant whenever needed.
I've already moved supplier assessment and quality forms to digital for a poultry producer in western Portugal — the kind of record that traceability then links to each batch.
Frequently asked questions
Do we have to change how we number batches? Usually not. The system adapts to the numbering the team already uses.
Do we need to buy equipment? Very little. Existing PCs and label printers are reused; usually all that's missing is a scanner or a rugged tablet at stations that have nothing today.
How long does it take? A first phase, already linking origin to finished product, takes weeks, not years. The rest goes in by phases, each one live before the next.
Does this guarantee IFS or BRCGS certification? Certification depends on the company and the auditor. What the system guarantees is that the data for traceability tests is there, complete, and comes out in minutes.
How much does it cost? It depends on the number of stations, the steps and the links to other systems. I work in phases at a fixed price — more on that in what custom software costs. The first conversation and the first visit are free.
How long would it take you today to rebuild a batch?
Tell me how your plant works. The first conversation costs nothing.
or call 914 106 162